Trail Build/Maintenance Day DATE & TIME: Sunday 3rd June 8:30am REGISTRATION: Online registration will be posted soon, however you're more than welcome to turn up on the day and sign in there. MEETING: Parks Vic Depot (Just above Skills Park) 13 Resovoir Rd Narre Warren North WORKS: We will be working on Lower Blair Witch trail, realigning the trail in three different sections and blocking off the old trail. Ideally, the materials we need will be there from prior preparation. If not, this build may occurr on the Sunday as we'll need the Saturday to prepare. BRING: Water, food, shovel (if you prefer your own shovel), good shoes (preferably steel capped) and appropriate clothing for weather. Please let us know if you're attending by replying on this forum thread (so we can organise tools and food etc). If you have any questions, please ask away. BBQ and cold drinks provided for free to volunteers at the end of the build. BYO food if you have any special food requirements. Builds usually run for 4-6 hours. If you need to leave early or are arriving later in the day, please message me on this forum or contact us via our contact form at www.lysterfieldmtb.com Hope to see you there. Cheers.