top of page

LDTR Trail Build Day - VES Course Drainage


Trail Build/Maintenance Day

DATE & TIME: 8:30am, Saturday 5th May 2018 (THIS SATURDAY) REGISTRATION: https://www.parkconnect.vic.gov.au/Volunteer/public-planned-activity/?id=96abe262-d64c-e811-bd6d-0003ff6f7a71

You're more than welcome to turn up on the day and sign in there. MEETING: Parks Vic Depot (Just above Skills Park) WORKS: We will be completing drainage along as many of the trails being used for the VES race course (20th May). We'll do an instructional at the beginning on what we will be doing before splitting off and covering as much ground as possible (depending on numbers). BRING: Water, food, shovel (if you prefer your own shovel), good shoes (preferably steel capped) and appropriate clothing for weather. There'll be a bit of walking. Please let us know if you're attending by replying on this forum thread (so we can organise tools and food etc). If you have any questions, please ask away. BBQ and cold drinks provided for free to volunteers at the end of the build. BYO food if you have any special food requirements. Builds usually run for 5 hours. If you need to leave early or are arriving later in the day, please message me on this forum or contact us via our contact form at www.lysterfieldmtb.com Hope to see you there. Cheers.


bottom of page